Renewable Energy Subsidy & Grant Estimator
Estimate the capital grant, feed-in tariff or tax credit available for a rooftop solar, heat pump, battery or EV charger install across major EU schemes, UK BUS/ECO4 and the US IRA 25D/45L credits.
Result
- Headline grant / credit
- €0
- Net capex after grant
- €12,000
- Effective subsidy rate
- 0.0%
- Rough payback (annual saving basis)
- 7.94 years
- Stacking rule
- Most schemes forbid stacking with feed-in tariff / PPA — check T&Cs.