Deck & Paving Sub-base Material Volume Calculator

MOT Type 1 / crushed stone, sharp sand and geotextile quantities for a patio, driveway, path or shed base — plus compacted vs loose volume conversion.

Result

MOT Type 1 (compacted)
2 m³ finished
MOT Type 1 (order loose)
2.5 m³ ≈ 5.25 t (7 bulk bags)
Sharp sand
0.69 m³ ≈ 1.1 t (2 bulk bags)
Geotextile
22 m² (stops pumping of fines into sub-base)
Excavation (bulk)
3.6 m³ soil to remove
Materials cost (aggregate only)
£361
Wacker plate hire
1 day @ €50–€70 for anything above 5 m² — do not skip compaction.