Production Throughput (OEE) Calculator
Overall Equipment Effectiveness — Availability × Performance × Quality — plus the good units per shift for a production line.
Result
- Availability (A)
- 90.6%
- Performance (P)
- 82.8%
- Quality (Q)
- 97.5%
- OEE
- 73.1%
- Good units per shift
- 702
- Lost production capacity
- 150 units