Stone Wall Tonnage Calculator
Tonnes of building stone needed for a dry-stone or pointed stone wall.
Result
- Wall volume
- 7.2 m³
- Stone (1.6 t/m³)
- 11.52 t
- Estimated stone cost
- £ 1,267
250+ free calculators for trades, home and everyday life
Dry-stone and pointed wall tonnage.
Tonnes of building stone needed for a dry-stone or pointed stone wall.